Good day all,
New person who would admire some recommendation earlier than they throw their laptop computer out the window!
I’m drawing home plans for a renovation mission.
I had drawn the ground plan (exterior and inner wall define) in Prime view. I then began extruding the partitions up and flooring faces down (the ground has serval ranges) in Iso view.
At this level it turned obvious that some flooring faces weren’t behaving appropriately, and I had doubtless hidden strains or unclosed geometry, some line seem thicker (maybe drawn them twice)
I additionally discovered that I ought to have formatted my mannequin higher (grouped exterior partitions, grouped inner partitions and so on). So I made a decision slightly than chasing ghosts I’d redraw the intial flooring plan…
My preliminary define flooring plan is nice by way of the dimension are right, so it will be nice if I may set that preliminary flooring plan at say z-axis degree 0, after which hint over/above it to attract a brand new clear flooring plan at say z-axis degree 4.
I have to introduce some method of part airplane above the preliminary flooring plan which can permit me to attract the brand new flooring plan to (X&Y axis) inline with the decrease plan however above it within the Z-axis.
I don’t even know if that’s doable, I’ve spent a few hours looking on-line however can’t work out whether it is doable. I’m on the level the place I feel I’ll simply must accomplished begin over.
Does this make sense to anybody and if that’s the case are you able to recommend how it may be finished?
TIA.